|
Design/Build
Campus
Center:
This 20,000 square foot, $1.800,000 tilt-wall facility with a
pre-engineered roof system serves as the Campus Center and
houses the cafeteria and Fine Arts Department.
Gymnasium:
This new 12,000 square foot tilt-wall structure consists of a
new gymnasium with a seating capacity of 350 and also
includes some classrooms and computer lab.
Baseball
Field Renovations:
Project was the demolition of existing facilities and site
improvements. The new improvements included new metal and
fabric fencing, concrete paving, shade structures, painting,
field irrigation and leveling, bleacher construction and
electrical modifications. These improvements were sponsored by
the Major League Baseball Player’s Association. |